MWI
MWI
About the project
MWI-1
MWI-2
MWI-3

This is our first project on building warehouse conveyors. There were two conveyors here, and our task was to model conduits along the conveyor, in some places going down the conveyor. We made three systems: conduits for Power, Ethernet, and Control. One of the challenges in modeling was to remain conduits either on a conveyor belt or somewhere below so that they do not interfere with the functioning of the conveyor and the people's work. This project was unusual because we had not done this before, and that's why we had a valuable experience working there.

For this project, BES Company offered the following services:
Low Voltage Distribution Systems (feeder conduits and raceways, distribution panels)
Wireway for Power, Control and Ethernet (Modeling and coordination cable tray systems)
Life Safety and Control services
Ethernet system (ethernet cable network, network topology modeling)

As the final product we delivered:
- Electrical Equipment Layout
- Wireway layout
- Conduit layout
- BOM

Read more
view projects
Contacts
Leave a request
We will contact you as soon as possible for a consultation
error
Name
error
Email
error
Phone
error
Comment
Contacts
We use cookies on our website to see how you interact with it. By accepting, you consent to our use of such cookies. Cookie Policy