Warehouse project in Pennsylvania – completed in November 2021 – provides space for a warehouse facility.
What was remarkable in this project, the cables were laid through the building without using conduits, but simply with MC cables, using structural beams as supports.
For this project, BES provided:
- Low Voltage Distribution Systems (feeders and raceway, switchgear, distribution panels)
- Prefab details for electrical equipment
We provided a final result:
- Electrical equipment layouts
- Feeder conduit layouts
- Skid layouts