Tesla Gigafactory
Tesla Gigafactory
About the project
Tesla Gigafactory-1
Tesla Gigafactory-2
Tesla Gigafactory-3
Tesla Gigafactory-4

For the Tesla Gigafactory Texas project, BES team provided model and shop drawings for instrumentation and control equipment, devices, and cables at the first stage of the project. Thousands of transmitters throughout the building were taken into account. All data in the instrument and control schedule were prepared for installation drawings.
 

For this project, BES Company offers the following services:

  • Low Voltage Distribution Systems (feeder conduits and raceways, distribution panels)
  • Power Cable trays (Modeling and coordination cable tray systems)
  • Instrumentation and Control services (I&C devices for technological piping processes, tools, mechanical and air handling systems, cables for them, panels for control and power)
  • Ethernet system (ethernet cable network and data devices, HMI panels to manage factory processes, network topology modeling)
  • Quantity take off for the project (Medium Voltage Cabling/Terminations, Low Voltage Cable Tray and Fiber Cabling, Setting Equipment, Medium Voltage GRC and PVC Conduits, Support Hardware quantity, Branch Power, Lighting Fixture Package Cost, Fire Alarm Raceway, Wiring, Terminations at Devices, Electrical Telecom)

As the final product we delivered:

  • Cable tray layouts
  • OH Conduit layouts
  • Rack layouts
  • Control equipment layouts
  • Penetration layouts
  • I&C device and support layouts
  • Cable routing layouts for instruments
  • I&C Device termination drawings
Read more
view projects
Contacts
Leave a request
We will contact you as soon as possible for a consultation
error
Name
error
Email
error
Phone
error
Comment
Contacts
We use cookies on our website to see how you interact with it. By accepting, you consent to our use of such cookies. Cookie Policy